BUSI 650 Quiz 3

  • BUSI 650 Quiz 3

BUSI 650 Quiz 3 with Answers

1. The lean tool to reduce setup times is SMED; this acronym stands for

2. When workers receive approval for a task based on inflated time estimate, they may perceive that they now have plenty of time to complete the task and therefore delay starting the task. What has this concept been called?

3. The project life cycle typically has a stretched-s or an exponential form.

4. Which of the following project categories might lead to the other project categories?

5. Which of the following terms provides the basis for the project schedule, often formatted as a project Gantt chart?

6. The amount of safety time needed to protect a particular path in a project is less than the sum of the safety times required to protect the individual activities making up the path.

7. Which of the following is NOT a direct benefit of lean?

8. The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place.

9. The optimistic time is the amount of time the project will take under the worst-case scenario.

10. Which of the following statement(s) concerning probabilities of completion is/are incorrect?

11. Lean enterprises rely on the push system, whereby company supply drives the production process.

12. A diagram where the physical flows of the parts are mapped onto the shop floor is referred to as muda.

13. Which of the following project categories typically seeks the development of a new generation of outputs?

14. Key aspects of the theory of constraints include identifying the bottlenecks in the process and balancing the work flows in the system.

15. Mixed-model assembly requires optimized production technology (OPT) for sequencing.

16. Pursuing perfection in lean organizations involves which of the following tools?

17. The following are characteristics of Lean when contrasted with traditional systems, EXCEPT:

18. Which of the following is NOT an example of a project?

19. An event is a series of connected activities from the start to the finish of the project.

20. According to Goldratt, to complete a project on time, the highest priority should be given to the:

21. Using CPM, when activity times are not known with certainty, we still can determine how long it will actually take to complete the project.

22. The step in the 5s approach in which the other four steps are made a habit is:

23. Favorable variances do not require corrective action or further investigation; only unfavorable variances in performance.

24. Any path that if delayed will delay the completion of the entire project is known as a:

25. Duration of critical path – path duration = __________?

Institution & Term/Date
Term/Date Liberty University
  • $9.99


Related Products

COUN 6312S Week 7 Quiz
COUN-6722-27 Week 10 Quiz (Fall 2021)
PUBH-4030-3 Week 2

PUBH-4030-3 Week 2

...

$9.99

PRAC 6540 Week 7 Quiz Winter 2021
NURS 6635 Final Exam 2021
HLTH 3115 Final Exam
NURS 6560 Final Exam 1
NURS 6560 Final Study Guide Part 1
NURS 6560 Midterm Exam
NURS 6560 Week 4 Board Vitals
NURS 6560 Final Exam (100 out of 100)
NURS 6054 Week 1 Quiz with Answers
TNCC Final Exam Test 2022 Open Book
HSCO 502 Exam 2

HSCO 502 Exam 2

...

$25.00

HSCO 502 Test 2 (Spring 2020)
BUSI 435 Week 1 Quiz
BUSI 435 Week 4 Quiz
BUSI 650 Quiz 1

BUSI 650 Quiz 1

...

$9.99

BUSI 650 Quiz 4

BUSI 650 Quiz 4

...

$9.99

CHEM 210 Exam 1 to 8 Final Exam
AHIP Test Review  Unit 1 to 5

Tags: